Fabrication works for the 80 ton capacity ramp required for the Ro-Ro operation of dry bulk cargo was successfully completed and delivered to JTC as part of their ongoing contract in the Shuaibah port. The work involved manufacturing of two main ramps of 12×2.3mtr and a shorter ramp from the main beam to the landing area. The 26 Ton structure consists of 2 main 900X300 beams which are laterally connected using 500×200 I beams. Customer has praised the works and Global International has once again proved its ability to undertake specialized fabrication works.